Active construction of a new locomotive and carriage depot is underway
20.11.2024
Construction of a new, modern locomotive and railway depot is being completed on the territory of the Sukhoi Port terminal. With an area of about 1800 sq. m., it has 2 tracks with 40m long observation pits for repairs, a crane-beam with a load capacity of 10 tons, 3 tracks for settling railway equipment. The room is also equipped with its own boiler room.