Commissioning of the container terminal
24.09.2023
The area is more than 1,000,000 sq. m.
A container terminal with a front for simultaneous processing of up to seven railway cars was put into operation, equipped with modern loading and unloading equipment, a storage area for dry and refrigerated containers, and all the necessary infrastructure for cargo clearance.






